One of the key infrastructure projects of the Bakhvi Hydro Power Plant (HPP) is the construction of a bridge over the Bakhvistskali River in the village of Ukanava.
The construction of the bridge commenced in March 2024 and was completed by May, 2024. The bridge is now fully operational, allowing for the passage of both light and heavy vehicles.
Technical Specifications of the Bridge:
• Width: 6 meters
• Length: 18 meters
Fifty percent of the personnel involved in the construction of the Bakhvi HPP project are local residents.
Watch the video: